Real job · Bethesda, MD · November 2026

Bethesda Kitchen Remodel: New Gas Line Run and Capped for the Range

By HiTrend Plumbers

In a Bethesda kitchen remodel, our technician ran a new flexible gas line to the new range spot, capped it with a shutoff valve at the floor, and put a test gauge on the line. The final range hookup comes after the inspection and once the floors and cabinets are in.

New black-jacketed flexible gas line branching off older gas piping through a red-handled shutoff valve and ending in a pressure test gauge
During: The new flexible gas line branches off the existing piping through a red-handled shutoff, with a test gauge on the line.
Wider view of the new black flexible gas line running down a painted block wall to a pressure test gauge, with a shutoff valve above
During: A wider view of the new line and test gauge.
Capped gas stub with a red-handled shutoff valve mounted on a metal plate on the subfloor, next to a WardFlex MAX information tag
After: At the new range spot: the line comes up through the subfloor on a mounting plate and is capped above a shutoff valve.

The problem

The kitchen was being remodeled, and the range was moving to a new spot. The gas line for the range had to be moved to match, before the new floors and cabinets went in.

What our technician found

Moving a gas range in a remodel is usually done in two visits. On the first, the new line is run to the new spot, capped, and put under test pressure so an inspector can check it. On the second, after the inspection and once the kitchen is finished, the range is connected. Any change to gas piping in Montgomery County needs a permit and an inspection.

What we did

  1. Ran a new black-jacketed flexible gas line from the existing gas piping to the new range location.
  2. Branched the new line off the existing piping through a red-handled shutoff valve.
  3. Brought the line up through the subfloor at the new range spot, mounted it on a metal plate, and capped it above a shutoff valve.
  4. Fitted a pressure test gauge to the new line.
  5. Next: the permit and inspection, then a return visit to connect the range once the floors and cabinets are in.

Parts used

  • WardFlex MAX flexible gas piping
  • Gas shutoff valves
  • Floor mounting plate
  • Pipe cap

The result

The new gas line for the range is run and capped at the new location. The permit, the inspection and the final range connection are still to come.

Tips for Bethesda homeowners

  • If a remodel moves a gas range, cooktop or dryer, get the gas work done before the floors and cabinets go in.
  • A capped gas stub with its own shutoff valve lets the rest of the remodel go on safely until the appliance is ready to connect.
  • Ask your plumber who pulls the gas permit and when the inspection will happen, so someone can be home for it.
  • Never connect or move a gas line yourself. Shut off the gas at the appliance valve and call a licensed plumber.
Seeing something similar in Bethesda?Call or text for a written price before any work.